11/19/24

 On 11/19/24 Provalenko emailed at 930am claiming that he needed urgent road plowing for septic pumping.  This is on a day that snow was forecast.  The road was dry in the week before and the days after this date.  There was about 2" when I left in the morning.  THERUG answered soon after, contacted the plow contractor immediately, and he came by 5pm.  Tire tracks indicate the septic truck came the following day.  

Ray

Pics of plowing on 11/19/24




                                                            US24 entry





Bottom of steep hill



Top of steep hill



731 / 10-5 intersection





Comments

Popular posts from this blog

Dec 7